The Boston Post Road Water tank is a 1.3 MG storage tank that was constructed in 1988 and was past due for rehab. The project was completed in 2023, on time and under budget.
![Boston Post Road Tank before and after Boston Post Road Tank before and after](https://eltownhall.com/wp-content/uploads/2024/07/BPR-Tank-Before-After.jpg)
Boston Post Road Tank before and after
Thanks to ARPA funds, East Lyme Water was able to sandblast and recoat the exterior, spot treat the inside coating and install a new Cathodic protection system to limit future corrosion concerns.