A downloadable “FINAL” copy of the Town of East Lyme 2023 MS4 Annual Report is available for public review on this webpage. A hard copy of the document is available in the Engineering Department located on the Lower Level of Town Hall at 108 Pennsylvania Avenue.

In accordance with the Connecticut Department of Energy & Environmental Protection General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems (MS4 General Permit) Effective July 1, 2017, the Town of East Lyme has complied with Section 4(d) of the General Permit by providing a Draft copy of the Annual Report for public review and comment. The final report is dated April 1, 2024.

Our Stormwater Management Plan (Updated in 2017) can be found here: Stormwater Management Plan

Our stormwater system mapping is available on our Public MS4 Map Viewer.

Additionally, a hard copy of the Stormwater management Plan and the most recent Stormwater Outfall Map is also available for review in the Engineering Department.

Questions or Comments regarding the Annual Report may be directed to:

Alex Klose       860-691-4112   aklose@eltownhall.com
East Lyme Engineering Department – Town Hall – Lower Level
108 Pennsylvania Avenue – Niantic, CT 06357

Information on the MS4 General Permit can be found on the CT DEEP Municipal Stormwater website.

The following links provide additional educational information relevant to the MS4 General Permit:

Additional information that supports the requirements of the MS4 General Permit can be found under the Recycling section on the Town website; including Grasscycling, Home Composting, Paint & Motor Oil Recycling, and Single Stream Recycling.

Posted to Town website eltownhall.com April 1, 2024

Downloads: