Contract for the Post and Rail Replacement Niantic River / Route 156 Boardwalk was awarded to and is under construction by Coastline Consulting & Development, LLC. See below for Plans and Specifications.
Downloads:
- Niantic River Boardwalk Plans & Specs 07-11-11.pdf (pdf)
- Addendum No. 1 Attachment - Wire Cloth Rail Panel Shop Drawing (pdf)
- Niantic River Boardwalk Addendum No. 1 (pdf)
- Niantic River Boardwalk Q&A for bidders.pdf (pdf)
- DOT Instructions & CertofInsur.pdf (pdf)
- DOT - Permit Bond.pdf (pdf)
- Niantic River Boardwalk Addendum 2.pdf (pdf)